Skip to content
Free Inspection Documented findings with photos, in writing, before storm season rather than after. Documented findings, in writing. Book yours →
FAMILY-OWNED IN DFW · 5-YEAR WRITTEN WORKMANSHIP WARRANTY · WE NEVER WAIVE DEDUCTIBLES. IT'S ILLEGAL IN TEXAS
[ NEW CONSTRUCTION ROOFING ]DFW METROPLEX · TX

Dallas–Fort Worth Metroplex

New Construction Roofing

Recommended by DFW homeownersRead their words →
Service infoDFW · est. 2023
  • (469) 405-7870
  • Serving the entire DFW metroplex. We come to you
  • Mon–Sat · 7:30 AM – 6:30 PM
  • 5-Year Written Workmanship Warranty, transferable
  • Family-owned & operated · residential + commercial
Direct answer

New-construction roofing runs on a builder's schedule and inspection sequence, not a replacement timeline. We work with builders and GCs across DFW on production and custom homes: dried-in on schedule, coordinated with the other trades, and inspected per the city's new-construction requirements.

Roofing for new builds

New-construction roofing runs on a builder’s schedule and inspection sequence, not a replacement timeline. We work with builders and GCs across DFW on production and custom homes: dried-in on schedule, coordinated with the other trades, and inspected per the city’s new-construction requirements.

Roofing inside a build schedule

New-construction roofing is a coordination discipline: the roof sits on the critical path between framing and everything interior, and a roofer who misses the dry-in window stalls every trade behind him. We work to the builder’s schedule with the two milestones that matter, dry-in (underlayment down, penetrations flashed, building weatherproof so interior trades can start) and final roof-out (surfacing complete, accessories on, punch-ready). Between them we sequence around the other roof-touching trades: HVAC penetrations, plumbing stacks, electrical masts, and solar rough-ins all land better when the roofer is in the conversation before the holes get cut.

Code, inspections, and the DFW patchwork

Every DFW municipality inspects new roofs on its own schedule against its own adopted code year. Deck nailing, underlayment type, flashing details, and ventilation ratios all get checked, and the sequence differs city to city. We build to the local inspector’s checklist the first time, schedule the inspections into the build calendar, and keep the documentation the builder’s closing package needs. Ventilation deserves its own sentence: balanced intake and exhaust is the code item most often value-engineered into a future shingle-warranty problem, and we don’t build it wrong to save a line item.

Material selection when everything is on the table

A new build is the one moment material choice is unconstrained: no tear-off economics, no matching problem, framing still adjustable for weight. It’s the cheapest moment a structure will ever have for upgrading to Class 4 impact shingles (insurance discounts from day one in this hail corridor), standing seam, or tile on framing designed for it. We quote builders honest tiering, from the production-grade baseline through the Class 4 upgrade to the premium options, with the cost deltas plain, so the buyer’s upgrade conversation happens with real numbers at the design stage instead of regret at year five.

What builders get from a roofing partner, specifically

Production and custom builders judge roofing subs on four numbers: schedule reliability at dry-in, punch-list length at roof-out, callback rate in year one, and how little the super has to think about any of it. We build for those numbers, with crews scheduled to the frame inspection’s reality rather than its optimism, penetrations coordinated before the cut, local inspection sequences handled without hand-holding, and closeout documentation (permits, inspection records, warranty registrations) delivered as a package the closing file can absorb. On the buyer side, every new roof carries the same two-layer warranty as our replacement work, manufacturer coverage on materials plus our written workmanship warranty, so the homeowner’s protection doesn’t depend on which entity built the house. Builders get the schedule; buyers get the roof; both get the paper.

If you’re a builder pricing your next community or a custom GC with a set of plans, send them over. Takeoffs and tiered quotes come back promptly, with the Class 4 and metal upgrade deltas broken out so your buyers can see their options priced honestly. If you’re an owner-builder, the same service applies, with a little more explanation wherever you want it.

ON PAPER FIRST

Planned before it exists.

A single-family house front elevation drawn as a construction document, the roof planes emphasized with slightly heavier gold linework and diagonal hatching, walls and windows in lighter white line, a dashed ridge line across the peak.
The roof as a document. Pitches, planes, and details settled in drawings before the first bundle arrives on site.
THE FINE PRINT, PLAINLY
  Permits

Permits and inspections

DFW cities each run their own permitting. Where your city requires a permit for roof work, we pull it and schedule the municipal inspection as part of the job. That never gets left to the homeowner.

  Warranty

What's covered

Every installation carries our 5-year written workmanship warranty, which transfers if the home sells. Storm and weather damage is insurance territory on any roof; we document it properly when it happens.

WHERE WE RUN IT

Cities where we run new construction roofing.

All DFW cities we serve →

ALL CITIES

New Construction Roofing, city by city.

Every city where this service has its own local page, with permits, hail history, and scheduling notes included.

WHO YOU HIRE MATTERS

Why hiring a documented local roofer matters.

Mastercraft Roofing

A local, documented roofer

Written findings with photos on every inspection
5-year written workmanship warranty, transferable
Permits pulled where your city requires them
We meet your adjuster; we never touch your deductible
Local crews, here after the storm season ends
Storm-chaser crews

The knock after the hail

Out-of-state plates, pressure to sign today
"We'll waive your deductible" is illegal in Texas
No local address to find when the warranty matters
Insurance paperwork games that risk your claim
Gone by the time the leaks show up
Doing it yourself

The honest limits

Fine for gutter cleaning and visual checks from the ground
Roof walking without training damages roofs and people
Insurance documentation needs pro-grade evidence
Code items and permits still apply to DIY work
One misstep costs more than the pro ever would

Common questions about new construction roofing

Do you work with individual owner-builders?

Yes. Custom and owner-builder projects are welcome. The coordination is the same: your framing schedule, the city's inspection sequence, and a roof system that fits the home's design and budget.

Do you work with builders and general contractors?

Yes, to the build schedule, with the two milestones that matter: dry-in that unblocks interior trades on time, and final roof-out that's punch-ready. Coordination with HVAC, plumbing, and electrical penetrations included.

What does dry-in mean?

The roof made weatherproof (underlayment down, penetrations flashed) so interior trades can start before final surfacing. It's the critical-path milestone between framing and everything inside the house.

Who handles the city roof inspections on a new build?

We do. Built to the local inspector's checklist the first time and scheduled into the build calendar. Every DFW city runs its own sequence and code year; knowing the differences is part of the service.

Is new construction the right time for Class 4 shingles?

It's the cheapest moment the structure will ever have for the upgrade: no tear-off economics, insurance discounts from day one, and DFW hail pricing the decision for you over the roof's life.

Why does attic ventilation matter so much on new builds?

Balanced intake and exhaust is a code item, a shingle-warranty condition, and a Texas cooling-load factor at once, and it's the item most often value-engineered into a future problem. We build it right the first time.

GUIDES

Straight answers, no pitch.

Request a free estimate.

No pressure, no door knockers. We look at the roof, tell you what it needs (and what it doesn't), and put the number in writing.

5-Year Written Workmanship Warranty Family-owned & operated Recommended by DFW homeowners

Payment plans available. The amount never changes, only the timing.

Need new construction roofing in DFW?

Call (469) 405-7870 Free Estimate