Skip to content
Free Inspection Documented findings with photos, in writing, before storm season rather than after. Documented findings, in writing. Book yours →
FAMILY-OWNED IN DFW · 5-YEAR WRITTEN WORKMANSHIP WARRANTY, TRANSFERABLE5-YEAR WRITTEN WARRANTY
[ COMMERCIAL ROOF REPLACEMENT ]DFW METROPLEX · TX

Dallas–Fort Worth Metroplex

Commercial Roof Replacement

Recommended by DFW homeownersRead their words →
Service infoDFW · est. 2023
  • (469) 405-7870
  • Serving the entire DFW metroplex. We come to you
  • Mon–Sat · 7:30 AM – 6:30 PM
  • 5-Year Written Workmanship Warranty, transferable
  • Family-owned & operated · residential + commercial
Direct answer

Commercial replacement starts with a question residential never asks: does the existing assembly come off, or can code and conditions support a recover? The answer lives in a moisture survey and core samples. Trapped moisture means tear-off, no matter how attractive recover pricing looks. We scope both paths honestly and show you the evidence behind the recommendation.

Tear-off vs. recover: the first decision

Commercial replacement starts with a question residential never asks: does the existing assembly come off, or can code and conditions support a recover? The answer lives in a moisture survey and core samples. Trapped moisture means tear-off, no matter how attractive recover pricing looks. We scope both paths honestly and show you the evidence behind the recommendation.

Tear-off versus recover: the first fork in every replacement

Commercial replacement starts with a question residential never asks: does the old roof come off, or does the new one go over it? Code generally allows one recover, meaning a new membrane over the existing assembly, and where the existing roof is dry and the deck sound, recovering skips tear-off labor, disposal tonnage, and days of open-roof exposure. But recovering over trapped moisture buries a failure that resurfaces through the new membrane’s warranty period. The fork is decided by evidence: a moisture survey across the field, core samples that show the assembly’s actual layers and condition, and a deck check. We run that diagnostic before quoting, because the honest number depends on it; any bid delivered without it is a guess wearing a price.

Replacing a roof over an operating business

The building keeps working while the roof comes off, and that constraint shapes commercial replacement more than any material choice. Phasing plans break the roof into sections that open and close within a workday. Staging, crane lifts, and material laydown get mapped around tenant parking and loading. Odor- and noise-sensitive operations (medical, food service, schools) get scheduling that respects them, and every day ends watertight: no section opens that can’t close before weather. Tenants get notice before disruption reaches them; the property manager gets a schedule they can forward. This choreography is a deliverable of the job, and it belongs in the proposal, not in improvisation.

What the specification decides

A commercial replacement is an assembly specification: deck repairs priced per unit up front, insulation thickness driven by the energy code and the owner’s utility math, cover board where hail and traffic argue for it (in DFW, that’s most roofs), membrane by building use (reflective TPO for the general case, PVC over kitchens, mod-bit where rooftop traffic runs heavy), and the attachment engineered to wind uplift at the building’s height and exposure. Every line answers to the building’s actual use and hold horizon. The closeout package carries manufacturer warranty registration, our written workmanship warranty, permits and inspection records, and the drawings the next decade’s maintenance will thank you for.

Budgeting a replacement before you need it

The least expensive commercial replacement is the one scheduled on purpose. Owners who assess early get to time the project: bidding it in the off-season instead of after the failure, phasing it across budget years where the roof plan allows, and choosing the assembly on the merits rather than under a leak’s deadline. The assessment that starts that clock costs little and reads out in years of warning; the alternative is the emergency replacement market, where options narrow and prices don’t. If your roof is in its second decade and undocumented, the capital-planning conversation is the one to have this quarter.

THE FINE PRINT, PLAINLY
  Permits

Permits and inspections

DFW cities each run their own permitting. Where your city requires a permit for roof work, we pull it and schedule the municipal inspection as part of the job. That never gets left to the homeowner.

  Warranty

What's covered

Workmanship is warranted in writing, and membrane systems carry their manufacturer coverage. Storm damage is an insurance matter, and our documented assessments protect the claim.

WHERE WE RUN IT

Cities where we run commercial roof replacement.

All DFW cities we serve →

ALL CITIES

Commercial Roof Replacement, city by city.

Every city where this service has its own local page, with permits, hail history, and scheduling notes included.

WHO YOU HIRE MATTERS

Why hiring a documented local roofer matters.

Mastercraft Roofing

A local, documented roofer

Written findings with photos on every inspection
5-year written workmanship warranty, transferable
Permits pulled where your city requires them
We meet your adjuster; we never touch your deductible
Local crews, here after the storm season ends
Storm-chaser crews

The knock after the hail

Out-of-state plates, pressure to sign today
"We'll waive your deductible" is illegal in Texas
No local address to find when the warranty matters
Insurance paperwork games that risk your claim
Gone by the time the leaks show up
Doing it yourself

The honest limits

Fine for gutter cleaning and visual checks from the ground
Roof walking without training damages roofs and people
Insurance documentation needs pro-grade evidence
Code items and permits still apply to DIY work
One misstep costs more than the pro ever would

Common questions about commercial roof replacement

How disruptive is a commercial replacement?

Planned properly, far less than owners fear. Staging, phasing by roof section, dead-load management, and coordination with tenant operations get engineered before the first cut. Most buildings stay fully operational through replacement.

Tear-off or recover: which is cheaper?

Recover costs less upfront when conditions allow it, but only a moisture survey can say whether they do. Recovering over trapped moisture buys a short-lived roof and a bigger tear-off bill later.

Can you install a new roof over our existing one?

Often. Code generally allows one recover, and over a dry, sound assembly it skips tear-off cost and exposure. The gate is evidence: moisture survey and core samples first, because recovering over trapped moisture buries a failure. We run the diagnostic before we quote.

Will replacement shut down our building?

No. Commercial replacement phases in sections that open and close within a workday, staged around your parking, loading, and operations. Every day ends watertight, and tenants get notice before disruption reaches them.

How long does a commercial roof replacement take?

Size, assembly, and weather set the range, from days on a small building to weeks on a large phased project. The proposal includes the phasing schedule, and daily watertight closes mean the timeline never leaves you exposed.

Which membrane should our building get?

Use decides: reflective TPO for the general case, PVC over kitchen exhaust, mod-bit where rooftop traffic runs heavy, coatings where the existing roof is sound. We quote the reasoning alongside the number.

What warranties come with a commercial replacement?

Two layers in writing: the manufacturer's system warranty on materials (registered as part of closeout) and our workmanship warranty on the labor. Maintenance terms keep both valid, which the closeout package spells out.

GUIDES

Straight answers, no pitch.

Request a free estimate.

No pressure, no door knockers. We look at the roof, tell you what it needs (and what it doesn't), and put the number in writing.

5-Year Written Workmanship Warranty Family-owned & operated Recommended by DFW homeowners

Payment plans available. The amount never changes, only the timing.

Need commercial roof replacement in DFW?

Call (469) 405-7870 Free Estimate